PDG Helicopters recently carried out flood damage repair work with Wintersgill Gardens for Shipley Golf Club, where their 7th hole was in danger of being washed away as a result of recent flooding of the Harden Beck.
Some 60 lifts of boulders were precisely placed allowing Shipley Golf Club to retain their signature par 3 hole.
PDG Helicopters has over 45 years of experience in under-slung load lifting and with 6 of its 17 aircraft operating in the load lifting role throughout the UK and Ireland, can provide a
rapid and cost effective solution to flood prevention and repair.