Helicopter Flood Prevention and Repair.

5/04/2016

PDG Helicopters recently carried out flood damage repair work with Wintersgill Gardens for Shipley Golf Club, where their 7th hole was in danger of being washed away as a result of recent flooding of the Harden Beck.

Some 60 lifts of boulders were precisely placed allowing Shipley Golf Club to retain their signature par 3 hole.

PDG Helicopters has over 45 years of experience in under-slung load lifting and with 6 of its 17 aircraft operating in the load lifting role throughout the UK and Ireland, can provide a
rapid and cost effective solution to flood prevention and repair.

Read the full story in The Yorkshire Post

Video